The project is located near Kastoria and Kozani.
The project was constructed on behalf of EGNATIA ENERGY and was executed between February and May 2013 and included the electrical installation of (cabling and connections) of 325 string inverters (SMA 17TL-TRIPOWER) 27659panels (SCHUKO 235W), total installed capacity of 6,5MWp on mounting structure by