The project is located near Dayicik.
The project was constructed on behalf of T-EGNATIA and was executed between April 2016 and June 2016 and included the electrical installation of (cabling and connections) of 204 string inverters (ABB Trio 27,6-TL-OUTD), 25434 panels(TRINA 260W), total installed capacity of 6,6MWp on mounting structure