The project is located near Sofades.
The project was constructed on behalf of EGNATIA ENERGY and was executed between January and February 2013 and included the electrical installation of (cabling and connections) of 3 central inverters (ABB PVS500) 6000panels (PHONOSOLAR 250W), total installed capacity of 1,5MWp on mounting structure by EXALCO.