The project is located near Katerini.
The project was constructed on behalf of EGNATIA ENERGY and was executed between September 2011 and February 2012 and included the electrical installation of (cabling and connections) of 240 string inverters (SMA 10TL-mono) 6880panels (Solarworld and Schott 235W), total installed capacity of 1,6MWp on mounting structure by Schuko.