The project is located near Trikala.
The project was constructed on behalf of EGNATIA ENERGY and was executed in June 2011 and included the electrical installation of (cabling and connections) of 49 string inverters (SMA 10TL-mono) 2127panels (SCHUKO 235W), total installed capacity of 0,5MWp on mounting structure by Grenel.