The project is located near Mersin Gulnar.
The project was constructed on behalf of T-EGNATIA and was executed between December 2015 and January 2016 and included the electrical installation of (cabling and connections) of 5 central inverters (SMA 900CP XT), 1 central inverter (SMA 500CP XT), 34086 panels(REC 255W), total installed capacity of 5,5MWp on mounting structure by SCHLETTER.