The project is located near Askale .
The project was constructed on behalf of T-EGNATIA and was executed between August and September 2016 and included the electrical installation of (cabling and connections) of 5 central inverters (SMA 1000CP XT), 22880 panels(TRINA 260W), total installed capacity of 5,94MWp on mounting structure by