The project is located near West Down. The project was constructed on behalf of EGN Project Limited and was executed in two phases:
- Phase 1 was executed between April and June 2014 and included the electrical installation of (cabling and connections) of 8 central inverters (ABB 800PVS), 34086 panels(REC 255W), total installed capacity of 8,69MWp on mounting structure by Alumil Hellas
- Phase 2 was executed during March 2015and included the electrical installation of (cabling and connections) of 2 central inverters (SMA 900CP HT), 9338 panels(REC 255W), total installed capacity of 2,39MWp on mounting structure by Praxia Solar